Project Information

ERS Bypass for modification of existing 400kV and 220kV overhead lines for clearance over New Abu Dhabi - Dubai Road (Package B)

Client

Musanada/TRANSCO

Scope performed by Enfras

As part of the Abu Dhabi–Dubai Road E311 (Package B) project, certain existing 400kV and 220kV overhead transmission lines near the Al Samha area require elevation adjustments to ensure the minimum vertical clearance above the proposed roadway. This is addressed through tailored interventions such as inserting new towers, relocating existing ones, or rerouting short sections of the lines based on site-specific conditions.

ENFRAS Scope involves verification of client's ERS Lot and application Engineering for all ERS crossings including expert guidance and supervision to facilitate above mentioned modifications in five locations, involving 400kV DC lines (Shahama East – Al Dahahma, Shahama East - Mussafah) and 220kV DC lines (Shahama East - Samkha, Al Wathba - Shahama East)

Customer/Main Contractor

National Contracting Co Ltd, Abu Dhabi

Project Location/ Country

United Arab Emirates