Project Information
400kV Double circuit OHL Existing Tower Validation (Subbiya - Sulaibiya - Fintas)
Client
MEW
Scope performed by Enfras
Checking condition (Loads, Strength and clearance) of existing tower for repositioning of cross arms (all nine) and propose suitable modifications.
A fast-track engineering assessment was conducted using available data from the customer and external sources, bypassing the conventional detailed evaluation process. The aim was to assess the short-term sustainability of the existing setup, which appears to be influenced by both tower selection and site implementation issues. While initial design parameters may have suggested a negative outcome, the evaluation proceeded based on realistic scenarios and engineering logic, in response to the customer’s request.
Customer/Main Contractor
Jyoti Structures Ltd
Project Location/ Country
Kuwait