Project Information
132kV OHL to UGC Transition station at RAK Main substation
Client
EtihadWE
Scope performed by Enfras
Design and Engineering pertaining to OHL to UGC Transition Station for TWO locations (One double circuit and One single circuit termination) including Cable sealing end compound arrangements and CSE & SA support structures design.
Insulation coordination study for RIFFA Main Substation (RIMN), RIFFA Main 2 (RMN2) and RAK Main Substation (RAKM) to TRANSCO FILA Grid Station
Customer/Main Contractor
Scan Electromechanic Cont. L.L.C
Project Location/ Country
United Arab Emirates